Design

Engineers & Designers

Noise Solutions’ team of engineers and designers work together to innovate best-in-class industrial noise suppression equipment. And to ensure facilities across North America maintain positive and productive reputations with local regulators and nearby residents.

Oil, gas, power and mining facilities, among others, have numerous industrial noise sources that need to be considered when building new facilities or where local regulations are in place.

To achieve our goal of unparalleled industrial noise suppression, Noise Solutions’ highly-skilled team of engineers and designers take the following into consideration:

  • Results from the Noise Impact Assessment
  • Source Order Ranked Sound Power Levels
  • Order Ranked Sound Pressure Levels
  • Area topography
  • Prevailing weather
  • Site operating conditions
  • Location of neighboring communities and residents
  • Local Noise Regulations
  • Targeted noise attenuation

Noise Solutions is a member of the Association of Professional Engineers and Geoscientists of Alberta (APEGA)

Engineering Directorate NASA Kennedy Space Centre
“I’ve been wanting to say “thanks” for the excellent work your Noise Solutions Team did in reducing the sound levels throughout the Shuttle Crawler Transporters. We had the opportunity to roll Shuttle Atlantis to the launch pad twice and I had the opportunity to experience first-hand the reduced noise levels due to your new Mufflers & Acoustical Ventilation Systems”
Perry L. Becker
Chief, Shuttle Ground Structural Systems Branch
Prairie Mines & Royalty Ltd.
“Noise Solutions Inc. proved they could set up an engineered solution, they could guarantee it, and stand by it and in the end all of our targets that were set as objectives were met, measured, and proven to be true.”
Gerald Perina
Materials Manager
Hunt Oil Company
“Our goal was to put 1445 horse power worth of compression on the Caroline Gas Plant without adding any noise to the existing ambient noise that came from the plant. I thought it was a pretty steep goal, but the acoustical assessment and Noise Solutions said it was achievable, so that seemed like the best viable option to go for. We did it and we met the goal of zero adder. Our operators were telling me later, when you stand outside the door in that building on the platform you couldn’t tell whether the compressor was running or not. So that’s pretty fantastic, really!”
Joe MacLean
Facilities Engineer
Trident Exploration
“Through our work with Noise Solutions we have been able to achieve the ERCB regulations set for a distance of 1500 meters on site.”
Greg Arthur
Northern Area Field Superintendent
Encana
“Working with the Noise Solutions Team is great because I know they have my best interests at the heart of their business. Their commitment to customer service is second to none.”
Steve Lee
EnCana