Walls

ACOUSTIC WALLS

 

NSI’s noise walls are engineered to meet each noise challenge. Our design criteria includes height to increase the “sound shadow” of the wall, thus making it more effective, wall make up to meet the transmission loss needed to reduce the industrial noise impact on the residents and absorption to minimize refection of the noise to another receiver.

Features include:

  • Engineered to meet the wind loads
  • 22 gauge pre-painted galvanized steel cladding (standard colors)
  • 20 gauge mill finish perforated aluminum line (30% open area)
  • Reinforced top channel (10 gauge steel) with bolted lifting eye hooks, Two (2) per section, so sections can be lifted in and out
  • Fast install

speak to a consultant

Call Today
Engineering Directorate NASA Kennedy Space Centre
“I’ve been wanting to say “thanks” for the excellent work your Noise Solutions Team did in reducing the sound levels throughout the Shuttle Crawler Transporters. We had the opportunity to roll Shuttle Atlantis to the launch pad twice and I had the opportunity to experience first-hand the reduced noise levels due to your new Mufflers & Acoustical Ventilation Systems”
Perry L. Becker
Chief, Shuttle Ground Structural Systems Branch
Prairie Mines & Royalty Ltd.
“Noise Solutions Inc. proved they could set up an engineered solution, they could guarantee it, and stand by it and in the end all of our targets that were set as objectives were met, measured, and proven to be true.”
Gerald Perina
Materials Manager
Hunt Oil Company
“Our goal was to put 1445 horse power worth of compression on the Caroline Gas Plant without adding any noise to the existing ambient noise that came from the plant. I thought it was a pretty steep goal, but the acoustical assessment and Noise Solutions said it was achievable, so that seemed like the best viable option to go for. We did it and we met the goal of zero adder. Our operators were telling me later, when you stand outside the door in that building on the platform you couldn’t tell whether the compressor was running or not. So that’s pretty fantastic, really!”
Joe MacLean
Facilities Engineer
Trident Exploration
“Through our work with Noise Solutions we have been able to achieve the ERCB regulations set for a distance of 1500 meters on site.”
Greg Arthur
Northern Area Field Superintendent
Encana
“Working with the Noise Solutions Team is great because I know they have my best interests at the heart of their business. Their commitment to customer service is second to none.”
Steve Lee
EnCana